What a PSI quotation should include
Author: BCA-PSI.sg editorial, QP Advisory Pte Ltd. Draft — pending professional review. Sources checked 13 Nov 2026.
Quotations are easier to compare when each one states the same things. Ask each engineer to set out:
- Who is responsible: the named Structural Engineer.
- Extent of inspection: the blocks, floors, roofs, basements and other areas covered.
- Access needs: units, plant rooms, roofs and other areas the owner must open, and any access equipment.
- Testing or investigation: whether anything is included, or how it will be priced if the engineer finds it necessary.
- Deliverables: the inspection report submitted to BCA, the forms involved, and photo records.
- Programme: inspection dates and report submission within BCA's timeframe.
- After the report: whether rectification design, tender and supervision of remedial works are included or separate.
- Exclusions and assumptions.
The scope of inspection and any testing remain the engineer's professional judgment for your building. This list is a comparison aid, not a specification.
Sources
- BCA — Periodic Structural Inspection (PSI) checked 14 Nov 2026
- BCA — PSI guidelines for Structural Engineers (Sep 2024) checked 14 Nov 2026