BCA-PSI.sg

What a PSI quotation should include

Author: BCA-PSI.sg editorial, QP Advisory Pte Ltd. Draft — pending professional review. Sources checked 13 Nov 2026.

Quotations are easier to compare when each one states the same things. Ask each engineer to set out:

  • Who is responsible: the named Structural Engineer.
  • Extent of inspection: the blocks, floors, roofs, basements and other areas covered.
  • Access needs: units, plant rooms, roofs and other areas the owner must open, and any access equipment.
  • Testing or investigation: whether anything is included, or how it will be priced if the engineer finds it necessary.
  • Deliverables: the inspection report submitted to BCA, the forms involved, and photo records.
  • Programme: inspection dates and report submission within BCA's timeframe.
  • After the report: whether rectification design, tender and supervision of remedial works are included or separate.
  • Exclusions and assumptions.

The scope of inspection and any testing remain the engineer's professional judgment for your building. This list is a comparison aid, not a specification.

Sources